This article is from the source 'bbc' and was first published or seen on . It will not be checked again for changes.

You can find the current article at its original source at http://news.bbc.co.uk/go/rss/-/1/hi/wales/south_east/7949061.stm

The article has changed 5 times. There is an RSS feed of changes available.

Version 2 Version 3
M4 reopens after lorry collision M4 reopens after lorry collision
(about 14 hours later)
The M4 motorway between Newport and Cardiff has reopened almost five hours after a collision between a car and a lorry closed both carriageways.The M4 motorway between Newport and Cardiff has reopened almost five hours after a collision between a car and a lorry closed both carriageways.
Tailbacks of up to six miles formed following the collision between J29 Castleton and J30 where the motorway meets the A48M.Tailbacks of up to six miles formed following the collision between J29 Castleton and J30 where the motorway meets the A48M.
Both the male lorry driver and woman car driver were taken to hospital in Cardiff after the crash at 1410 GMT. Both the male lorry driver and female car driver were taken to hospital in Cardiff after the crash at 1410 GMT.
Police said their injuries were not believed to be life threatening.Police said their injuries were not believed to be life threatening.
The accident happened on the westbound carriageway. It is thought there was damage to the central reservation and road surface.The accident happened on the westbound carriageway. It is thought there was damage to the central reservation and road surface.
The motorway was reopened just after 1900 GMT following the removal of both the car and lorry, and a safety inspection.The motorway was reopened just after 1900 GMT following the removal of both the car and lorry, and a safety inspection.
Traffic Wales said the delays caused by the closure were beginning to ease.Traffic Wales said the delays caused by the closure were beginning to ease.
Further delays were caused after one lane of the M4 eastbound was blocked by a broken down lorry between junctions 32 Coryton and 30 Cardiff Gate.Further delays were caused after one lane of the M4 eastbound was blocked by a broken down lorry between junctions 32 Coryton and 30 Cardiff Gate.