This article is from the source 'bbc' and was first published or seen on . It will not be checked again for changes.

You can find the current article at its original source at http://news.bbc.co.uk/go/rss/-/1/hi/england/7206696.stm

The article has changed 7 times. There is an RSS feed of changes available.

Version 3 Version 4
Landslip closes part of rail line Landslip closes part of rail line
(40 minutes later)
A major landslip has disrupted First Great Western services between London Paddington and south Wales.A major landslip has disrupted First Great Western services between London Paddington and south Wales.
The slippage was reported at about 1100 GMT near the Chipping Sodbury tunnel, and has closed a main line between Swindon and Bristol Parkway stations.The slippage was reported at about 1100 GMT near the Chipping Sodbury tunnel, and has closed a main line between Swindon and Bristol Parkway stations.
The landslip has damaged signal boxes, but not the line itself.The landslip has damaged signal boxes, but not the line itself.
Some trains between Bristol and Swindon could be cancelled for several days, although there is another line between south Wales and London in service.Some trains between Bristol and Swindon could be cancelled for several days, although there is another line between south Wales and London in service.
'Coach connection'
Passengers are being warned of short notice alterations, cancellations and delays of up to 30 minutes.Passengers are being warned of short notice alterations, cancellations and delays of up to 30 minutes.
A number of services between London Paddington and Cardiff Central have already been cancelled.A number of services between London Paddington and Cardiff Central have already been cancelled.
'Completely rebuilt'
Services which were due to run from Bristol Parkway will call at Patchway station instead, with a coach connection linking the two.Services which were due to run from Bristol Parkway will call at Patchway station instead, with a coach connection linking the two.
On Thursday afternoon, First Great Western spokesman Richard Smith, said the line needed to be "completely rebuilt", including stabilisation work, new foundations, and new track and signalling.On Thursday afternoon, First Great Western spokesman Richard Smith, said the line needed to be "completely rebuilt", including stabilisation work, new foundations, and new track and signalling.
"Until we can get engineers to the site to see the damage, we won't know what caused it, but it has covered several boxes that control points," he said."Until we can get engineers to the site to see the damage, we won't know what caused it, but it has covered several boxes that control points," he said.
A Network Rail spokeswoman added: "We've got engineers down there inspecting the site and looking to restore services as soon as we can."
The incident happened on the day a rail consumer watchdog released a survey putting the train operator bottom of a passenger satisfaction league table.The incident happened on the day a rail consumer watchdog released a survey putting the train operator bottom of a passenger satisfaction league table.
The company has been criticised for poor service, delays and overcrowding.The company has been criticised for poor service, delays and overcrowding.