This article is from the source 'bbc' and was first published or seen on . It will not be checked again for changes.

You can find the current article at its original source at http://news.bbc.co.uk/go/rss/-/1/hi/scotland/glasgow_and_west/7188577.stm

The article has changed 7 times. There is an RSS feed of changes available.

Version 3 Version 4
Bridge closed after cable 'snap' Bridge closed after cable 'snap'
(about 1 hour later)
The newest bridge over the River Clyde in Glasgow has been closed after a support cable snapped and landed on the carriageway on Monday night.The newest bridge over the River Clyde in Glasgow has been closed after a support cable snapped and landed on the carriageway on Monday night.
People nearby reported hearing a loud "snap" from the Clyde Arc bridge, which joins Finnieston with Kinning Park.People nearby reported hearing a loud "snap" from the Clyde Arc bridge, which joins Finnieston with Kinning Park.
Dubbed the "Squinty Bridge", it cost £20.3m and was opened to traffic in September 2006.Dubbed the "Squinty Bridge", it cost £20.3m and was opened to traffic in September 2006.
No-one was injured in the incident. Glasgow City Council said it was not known when the bridge would reopen.No-one was injured in the incident. Glasgow City Council said it was not known when the bridge would reopen.
Public safetyPublic safety
John Colvin, the night manager at the nearby City Inn hotel, said the noise had been very worrying.John Colvin, the night manager at the nearby City Inn hotel, said the noise had been very worrying.
He said: "To be honest it was a scary sound, it sounded like a bomb going off.He said: "To be honest it was a scary sound, it sounded like a bomb going off.
"We felt the vibrations of it right here. We looked out and someone said one of the supports had gone on the bridge and the whole thing was shaking.""We felt the vibrations of it right here. We looked out and someone said one of the supports had gone on the bridge and the whole thing was shaking."
Mr Colvin added that the cable snapped at about 2330 GMT, when there were no cars on the bridge.Mr Colvin added that the cable snapped at about 2330 GMT, when there were no cars on the bridge.
We don't believe the bridge's integrity is at risk, but it has been closed for public safety reasons Glasgow City Council spokeswoman The cables are an integral part of the bridge structure
A spokeswoman for Glasgow City Council said: "The bridge is designed to allow for struts to be removed one at a time to be repaired.A spokeswoman for Glasgow City Council said: "The bridge is designed to allow for struts to be removed one at a time to be repaired.
"We don't believe the bridge's integrity is at risk, but it has been closed for public safety reasons.""We don't believe the bridge's integrity is at risk, but it has been closed for public safety reasons."
The spokeswoman added that a design team would inspect the structure before deciding what action to take, and the bridge will remain closed until then.The spokeswoman added that a design team would inspect the structure before deciding what action to take, and the bridge will remain closed until then.
No firm timeline is available for when the bridge will be reopened.No firm timeline is available for when the bridge will be reopened.
The bridge spans 140 metres and was designed by engineering consultancy Halcrow. It was built by Kilsyth-based civil engineering contractor Edmund Nuttall Ltd.The bridge spans 140 metres and was designed by engineering consultancy Halcrow. It was built by Kilsyth-based civil engineering contractor Edmund Nuttall Ltd.
The structure is a tied arch design, carrying four traffic lanes. One lane in each direction is reserved for public transport and there are pedestrian and cycle paths.The structure is a tied arch design, carrying four traffic lanes. One lane in each direction is reserved for public transport and there are pedestrian and cycle paths.
Running at an angle across the water, it was the first new road bridge over the river to be built since 1969.Running at an angle across the water, it was the first new road bridge over the river to be built since 1969.
The Saltire Society gave the bridge a civil engineering award last year.The Saltire Society gave the bridge a civil engineering award last year.