This article is from the source 'bbc' and was first published or seen on . It will not be checked again for changes.
You can find the current article at its original source at http://news.bbc.co.uk/go/rss/-/1/hi/scotland/glasgow_and_west/7188577.stm
The article has changed 7 times. There is an RSS feed of changes available.
Version 1 | Version 2 |
---|---|
Bridge closed after cable 'snap' | Bridge closed after cable 'snap' |
(about 1 hour later) | |
The newest bridge over the River Clyde in Glasgow has been closed after a support cable snapped and landed on the carriageway at about 2330 BST. | |
People nearby reported hearing a loud "snap" from the Clyde Arc bridge, which joins Finnieston with Kinning Park. | People nearby reported hearing a loud "snap" from the Clyde Arc bridge, which joins Finnieston with Kinning Park. |
Dubbed the "Squinty Bridge", it cost £20.3m and was opened to traffic in September 2006. | Dubbed the "Squinty Bridge", it cost £20.3m and was opened to traffic in September 2006. |
No-one was injured in the incident. Glasgow City Council said it was not known when the bridge would reopen. | No-one was injured in the incident. Glasgow City Council said it was not known when the bridge would reopen. |
Public safety | Public safety |
John Colvin, the night manager at the nearby City Inn hotel, said the noise had been very worrying. | John Colvin, the night manager at the nearby City Inn hotel, said the noise had been very worrying. |
He said: "To be honest it was a scary sound, it sounded like a bomb going off. | He said: "To be honest it was a scary sound, it sounded like a bomb going off. |
"We felt the vibrations of it right here. We looked out and someone said one of the supports had gone on the bridge and the whole thing was shaking." | "We felt the vibrations of it right here. We looked out and someone said one of the supports had gone on the bridge and the whole thing was shaking." |
Mr Colvin added that the cable snapped when there were no cars on the bridge. | Mr Colvin added that the cable snapped when there were no cars on the bridge. |
We don't believe the bridge's integrity is at risk, but it has been closed for public safety reasons Glasgow City Council spokeswoman | We don't believe the bridge's integrity is at risk, but it has been closed for public safety reasons Glasgow City Council spokeswoman |
A spokeswoman for Glasgow City Council said: "The bridge is designed to allow for struts to be removed one at a time to be repaired. | A spokeswoman for Glasgow City Council said: "The bridge is designed to allow for struts to be removed one at a time to be repaired. |
"We don't believe the bridge's integrity is at risk, but it has been closed for public safety reasons." | "We don't believe the bridge's integrity is at risk, but it has been closed for public safety reasons." |
The spokeswoman added that a design team would inspect the structure before deciding what action to take, and the bridge will remain closed until then. | The spokeswoman added that a design team would inspect the structure before deciding what action to take, and the bridge will remain closed until then. |
No firm timeline is available for when the bridge will be reopened. | No firm timeline is available for when the bridge will be reopened. |
The bridge spans 140 metres and was designed by engineering consultancy Halcrow. It was built by Kilsyth-based civil engineering contractor Edmund Nuttall Ltd. | The bridge spans 140 metres and was designed by engineering consultancy Halcrow. It was built by Kilsyth-based civil engineering contractor Edmund Nuttall Ltd. |
The structure is a tied arch design, carrying four traffic lanes. One lane in each direction is reserved for public transport and there are pedestrian and cycle paths. | The structure is a tied arch design, carrying four traffic lanes. One lane in each direction is reserved for public transport and there are pedestrian and cycle paths. |
Running at an angle across the water, it was the first new road bridge over the river to be built since 1969. | Running at an angle across the water, it was the first new road bridge over the river to be built since 1969. |
The Saltire Society gave the bridge a civil engineering award last year. | The Saltire Society gave the bridge a civil engineering award last year. |