This article is from the source 'bbc' and was first published or seen on . It last changed over 40 days ago and won't be checked again for changes.
You can find the current article at its original source at http://www.bbc.co.uk/news/uk-england-23996065
The article has changed 12 times. There is an RSS feed of changes available.
Version 1 | Version 2 |
---|---|
Dartford Crossing closure causes M25 traffic chaos | Dartford Crossing closure causes M25 traffic chaos |
(35 minutes later) | |
Motorists are facing huge delays after the M25 Dartford Crossing between Kent and Essex was closed in both directions because of a security alert. | Motorists are facing huge delays after the M25 Dartford Crossing between Kent and Essex was closed in both directions because of a security alert. |
The Highways Agency closed the Queen Elizabeth II Bridge at 17:00 BST, with both tunnels shut 20 minutes later. | The Highways Agency closed the Queen Elizabeth II Bridge at 17:00 BST, with both tunnels shut 20 minutes later. |
Police said they were called at 16:00 BST to a report that a male pedestrian was behaving unusually. | Police said they were called at 16:00 BST to a report that a male pedestrian was behaving unusually. |
He was arrested and officers said they had found a suspicious item, leading to the closure of the crossing. | He was arrested and officers said they had found a suspicious item, leading to the closure of the crossing. |
Motorists stuck in the queues of traffic have reported seeing an army bomb disposal vehicle, ambulances and emergency service vehicles heading towards the crossing. | |
'Trapped vehicles' | |
The force said it expected the crossing to be closed for some time and advised motorists to find alternative routes. | The force said it expected the crossing to be closed for some time and advised motorists to find alternative routes. |
Trapped traffic on the bridge is being released and diverted back into Essex, while some trapped vehicles have been released from the tunnels. | |
The toll booths have also been cleared of traffic. | |
There are reportedly nine-mile tailbacks in both Kent, on the anti-clockwise M25, and in Essex, on the clockwise stretch. | |
In London, there are severe delays in East Ham, Beckton, Bow, Woolwich, at the Blackwall Tunnel and all approaches to the M25. | In London, there are severe delays in East Ham, Beckton, Bow, Woolwich, at the Blackwall Tunnel and all approaches to the M25. |
The A11, A12 and A13 also have extra heavy traffic. | The A11, A12 and A13 also have extra heavy traffic. |
The A282 Dartford to Thurrock crossing over the River Thames, which consists of the Queen Elizabeth II Bridge and two tunnels, is used by 140,000 vehicles a day. | The A282 Dartford to Thurrock crossing over the River Thames, which consists of the Queen Elizabeth II Bridge and two tunnels, is used by 140,000 vehicles a day. |
Traffic heading south into Kent uses the bridge, while northbound vehicles travelling to Essex use the tunnels, with the M25 linking up either side. | Traffic heading south into Kent uses the bridge, while northbound vehicles travelling to Essex use the tunnels, with the M25 linking up either side. |
Send your pictures and videos to yourpics@bbc.co.uk or text them to 61124 (UK) or +44 7624 800 100 (International). If you have a large file you can upload here. | |
Read the terms and conditions |