This article is from the source 'independent' and was first published or seen on . It last changed over 40 days ago and won't be checked again for changes.

You can find the current article at its original source at http://www.independent.co.uk/news/uk/home-news/grenfell-tower-fire-resistant-cladding-kensington-inquiry-latest-reynobond-london-a7792781.html

The article has changed 3 times. There is an RSS feed of changes available.

Version 1 Version 2
Grenfell Tower: Using fire-resistant cladding on Kensington block 'would have cost £5,000 extra' Grenfell Tower: Using fire-resistant cladding on Kensington block 'would have cost £5,000 extra'
(about 20 hours later)
Installing fire-resistant cladding at Grenfell Tower would have cost just £5,000 extra, it has been claimed, after the spotlight fell on the building's facade as a factor in Wednesday's devastating fire.Installing fire-resistant cladding at Grenfell Tower would have cost just £5,000 extra, it has been claimed, after the spotlight fell on the building's facade as a factor in Wednesday's devastating fire.
The Kensington tower block was totally incinerated in the blaze and at least 17 people were killed. It was refurbished in 2016 at a cost of about £8.6m and new aluminium panels were added to the exterior.The Kensington tower block was totally incinerated in the blaze and at least 17 people were killed. It was refurbished in 2016 at a cost of about £8.6m and new aluminium panels were added to the exterior.
A salesman for the US company Reynobond, which produces the panels, told The Times the type of material believed to have been used on Grenfell Tower was banned on tall buildings in the US “because of the fire and smoke spread”.A salesman for the US company Reynobond, which produces the panels, told The Times the type of material believed to have been used on Grenfell Tower was banned on tall buildings in the US “because of the fire and smoke spread”.
According to the paper, a flammable version with a plastic core was used at Grenfell Tower, in place of a fire-resistant one that cost £2 more per square metre.According to the paper, a flammable version with a plastic core was used at Grenfell Tower, in place of a fire-resistant one that cost £2 more per square metre.
Kensington and Chelsea council documents show the refurbishment, which also included new windows, was intended to provide better insulation and energy efficiency.Kensington and Chelsea council documents show the refurbishment, which also included new windows, was intended to provide better insulation and energy efficiency.
Rydon Construction, which refurbished the building, said that it was confident the construction was up to standards.Rydon Construction, which refurbished the building, said that it was confident the construction was up to standards.
It said it was "shocked to hear of the devastating fire" but that all the work "met all required building control, fire regulation and health & safety standards".It said it was "shocked to hear of the devastating fire" but that all the work "met all required building control, fire regulation and health & safety standards".
London Mayor Sadiq Khan has demanded a public inquiry, ordered by the Government, produce an interim report so residents and politicians can get answers sooner about how the disaster happened.London Mayor Sadiq Khan has demanded a public inquiry, ordered by the Government, produce an interim report so residents and politicians can get answers sooner about how the disaster happened.
And thousands of homes in tower blocks across the UK are undergoing urgent safety reviews following the fire.And thousands of homes in tower blocks across the UK are undergoing urgent safety reviews following the fire.
Latest iPhone X, iPhone 8 and iOS 11 news live – follow all the updates here.