This article is from the source 'bbc' and was first published or seen on . It last changed over 40 days ago and won't be checked again for changes.
You can find the current article at its original source at http://www.bbc.co.uk/news/uk-england-york-north-yorkshire-38852930
The article has changed 6 times. There is an RSS feed of changes available.
Version 1 | Version 2 |
---|---|
Flood-hit Tadcaster bridge opening to reunite town | Flood-hit Tadcaster bridge opening to reunite town |
(35 minutes later) | |
A flood-damaged bridge in North Yorkshire is due to reopen later after being closed for more than a year. | A flood-damaged bridge in North Yorkshire is due to reopen later after being closed for more than a year. |
The listed 18th Century bridge over the River Wharfe in Tadcaster partially collapsed on 29 December 2015. | The listed 18th Century bridge over the River Wharfe in Tadcaster partially collapsed on 29 December 2015. |
The town was cut in two to traffic with the only crossing being a temporary footbridge built a year ago. | The town was cut in two to traffic with the only crossing being a temporary footbridge built a year ago. |
The reopening has been slightly delayed with "unusual and persistent" high river levels adding to the construction problems. | The reopening has been slightly delayed with "unusual and persistent" high river levels adding to the construction problems. |
However, North Yorkshire County Council said repairs of this kind would normally take about two years and it had been "extremely challenging" to get the bridge open. | However, North Yorkshire County Council said repairs of this kind would normally take about two years and it had been "extremely challenging" to get the bridge open. |
Live updates and other stories from Yorkshire | Live updates and other stories from Yorkshire |
The bridge was repaired and widened with about £4m of funding, said the council. | The bridge was repaired and widened with about £4m of funding, said the council. |
The last stone was put in place on the bridge's parapet wall just this morning, it said. | |
With the bridge closed, motorists have faced a long diversion along the A64 to reach the other side of town. | With the bridge closed, motorists have faced a long diversion along the A64 to reach the other side of town. |
The Tadcaster bridge story | |
First stone bridge crossing the river built around 1200 | |
The present bridge was built around 1700 | |
Parts of town hit on 26 December 2015 during severe winter floods | |
Bridge partially collapsed 29 December 2015 | |
Temporary footbridge opened 12 February 2016 | |
Repaired and widened bridge to open 3 February |