This article is from the source 'bbc' and was first published or seen on . It last changed over 40 days ago and won't be checked again for changes.

You can find the current article at its original source at http://www.bbc.co.uk/news/uk-england-york-north-yorkshire-38852930

The article has changed 6 times. There is an RSS feed of changes available.

Version 1 Version 2
Flood-hit Tadcaster bridge opening to reunite town Flood-hit Tadcaster bridge opening to reunite town
(35 minutes later)
A flood-damaged bridge in North Yorkshire is due to reopen later after being closed for more than a year.A flood-damaged bridge in North Yorkshire is due to reopen later after being closed for more than a year.
The listed 18th Century bridge over the River Wharfe in Tadcaster partially collapsed on 29 December 2015.The listed 18th Century bridge over the River Wharfe in Tadcaster partially collapsed on 29 December 2015.
The town was cut in two to traffic with the only crossing being a temporary footbridge built a year ago.The town was cut in two to traffic with the only crossing being a temporary footbridge built a year ago.
The reopening has been slightly delayed with "unusual and persistent" high river levels adding to the construction problems.The reopening has been slightly delayed with "unusual and persistent" high river levels adding to the construction problems.
However, North Yorkshire County Council said repairs of this kind would normally take about two years and it had been "extremely challenging" to get the bridge open.However, North Yorkshire County Council said repairs of this kind would normally take about two years and it had been "extremely challenging" to get the bridge open.
Live updates and other stories from YorkshireLive updates and other stories from Yorkshire
The bridge was repaired and widened with about £4m of funding, said the council.The bridge was repaired and widened with about £4m of funding, said the council.
The last stone was put in place on the bridge's parapet wall just this morning, it said.
With the bridge closed, motorists have faced a long diversion along the A64 to reach the other side of town.With the bridge closed, motorists have faced a long diversion along the A64 to reach the other side of town.
The Tadcaster bridge story
First stone bridge crossing the river built around 1200
The present bridge was built around 1700
Parts of town hit on 26 December 2015 during severe winter floods
Bridge partially collapsed 29 December 2015
Temporary footbridge opened 12 February 2016
Repaired and widened bridge to open 3 February