This article is from the source 'bbc' and was first published or seen on . It last changed over 40 days ago and won't be checked again for changes.
You can find the current article at its original source at http://www.bbc.co.uk/news/uk-england-lancashire-36264048
The article has changed 3 times. There is an RSS feed of changes available.
Version 0 | Version 1 |
---|---|
Fire breaks out at Bamber Bridge plastics manufacturer | Fire breaks out at Bamber Bridge plastics manufacturer |
(35 minutes later) | |
A large fire has broken out at a plastics manufacturer in Lancashire. | A large fire has broken out at a plastics manufacturer in Lancashire. |
Firefighters were called to Walton Summit business park in Bamber Bridge at 02:50 BST after a unit containing large quantities of fuel caught fire. | Firefighters were called to Walton Summit business park in Bamber Bridge at 02:50 BST after a unit containing large quantities of fuel caught fire. |
About 60 firefighters are tackling the blaze, which they said "escalated very quickly". There are no toxic materials at the unit. | |
Residents in the area are being advised to keep doors and windows shut due to the smoke. Nearby roads are closed. | Residents in the area are being advised to keep doors and windows shut due to the smoke. Nearby roads are closed. |
Lancashire Fire and Rescue Service area manager, Simon Fryer, said the fire is under control but urged people to avoid the area. | Lancashire Fire and Rescue Service area manager, Simon Fryer, said the fire is under control but urged people to avoid the area. |
He said the building "was occupied at the time and processes were taking place" and "due to the fuel that's inside the building, it escalated very, very quickly". | He said the building "was occupied at the time and processes were taking place" and "due to the fuel that's inside the building, it escalated very, very quickly". |